检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李鹏飞[1] LI Pengfei(China Railway 19th Bureau Group Co.,Ltd.,Beijing 100176,China)
出 处:《现代交通技术》2024年第4期65-68,88,共5页Modern Transportation Technology
摘 要:为减小地铁车站建设中明挖法施工对现状地面交通疏导的不利影响,常采用盖挖法修筑临时路面系统,最大限度地维持路面交通状态,利用军用梁建立临时路面体系便是常用方式之一。以沈阳地铁4号线北大营站为研究对象,基于项目周边环境因素介绍了军用梁临时路面体系的设计思路、安装方法和受力特点。该方法可有效解决城市主干道下地铁车站基坑施工期间的道路交通疏导难题,对类似工程有一定的参考价值。In order to reduce the adverse impact of open cut method in subway station construction on the current ground traffic diversion,the covered excavation is often used to construct the temporary pavement system to maintain the road traffic state to the maximum extent,and the establishment of temporary pavement system by using military beams is one of the common ways.Taking Beidaying Station of Shenyang Metro Line 4 as the research object,based on the surrounding environmental factors of the project,this paper introduces the design idea,installation method and mechanical characteristics of the temporary pavement system of military beams.This method can effectively solve the road traffic diversion problem during the foundation pit construction of subway station under urban main roads,and has certain reference value for similar projects.
分 类 号:U231.3[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:52.15.220.116