考虑配电网灵活性供需匹配度及网络传输的储能和智能软开关协同规划  被引量:1

Energy Storage System and Soft Open Point Coordinated Planning Considering Distribution Network Flexibility Supply-Demand Matching and Network Transmission

在线阅读下载全文

作  者:陈依杭 李晓露 柳劲松 林顺富 CHEN Yihang;LI Xiaolu;LIU Jinsong;LIN Shunfu(College of Electrical Engineering,Shanghai University of Electric Power,Shanghai 200090,China;Electric Power Research Institute,State Grid Shanghai Electric Power Company,Shanghai 200437,China)

机构地区:[1]上海电力大学电气工程学院,上海市200090 [2]国网上海市电力公司电力科学研究院,上海市200437

出  处:《电力建设》2024年第9期49-62,共14页Electric Power Construction

基  金:国家自然科学基金项目(51977127)。

摘  要:随着分布式电源渗透率不断提高,配电网运行面临着源荷不确定性带来的灵活性不足问题。合理配置储能(energy storage system, ESS)和智能软开关(soft open point, SOP)等灵活性资源是解决该问题的关键。为此,从灵活性供需匹配度和传输能力2个方面提出了考虑配电网灵活性提升的ESS和SOP三层协同规划模型。其中,上层以ESS投资成本最小为目标对蓄电池和超级电容器等多时间尺度储能进行规划,中层以配电网年综合成本最小为目标对SOP进行规划,下层以各场景下的网络灵活性最优为目标进行优化,并采用自适应粒子群算法和二阶锥规划算法对模型进行求解。最后,在IEEE 33节点系统上验证了所提方法的有效性。结果表明,相比仅考虑单一时间尺度的规划方法,所提的ESS和SOP协同规划方法的配电网年综合成本降低了4.59%,实现了配电网经济灵活运行。With the increasing penetration rates of distributed generators,the operation of distribution networks faces the challenge of insufficient flexibility owing to uncertainties in supply and demand.The key to addressing this issue lies in properly allocating flexible resources,such as energy storage systems(ESS)and soft open points(SOP).To this end,a three-level coordinated planning model for ESS and SOP that considers the flexibility of the distribution network is proposed in terms of flexibility,supply-demand matching,and transmission capacity.Within this model,the upper-level plans for multi-timescale energy storage,such as storage batteries and supercapacitors,aim to minimize the ESS investment costs.The middle-level plans for the SOP are intended to minimize the annual comprehensive operation cost of the distribution network.The lower-level plans optimize the objective of network flexibility in each scenario and solve the model using an adaptive particle swarm algorithm and a second-order cone planning algorithm.Finally,the effectiveness of the method is verified using an IEEE 33-bus system.The results show that,compared with the planning method that only considers a single time scale,the coordinated planning approach of the ESS and SOP proposed in this study reduces the annual comprehensive cost of the distribution network by 4.59%,thereby achieving the economic and flexible operation of the distribution network.

关 键 词:配电网 灵活性供需匹配度 网络灵活性 智能软开关 储能装置 

分 类 号:TM73[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象