检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:薛征 XUE Zheng(Research Institute of Oil Production Technology,Petrochina Daqing Oilfield Co.,LTD.Daqing,Heilongjiang 163453,China;Key Laboratory of Oil and Gas Reservoir Stimulation in Heilongjiang Province,Daqing,Heilongjiang 163453,China;National Key Laboratory of Green Exploitation of Continental Shale Oil Based on Multi-Resource Collaboration,Daqing,Heilongjiang 163453,China)
机构地区:[1]中国石油大庆油田有限责任公司采油工艺研究院,黑龙江大庆163453 [2]黑龙江省油气藏增产增注重点实验室,黑龙江大庆163453 [3]多资源协同陆相页岩油绿色开采全国重点实验室,黑龙江大庆163453
出 处:《石油工业技术监督》2024年第9期17-21,共5页Technology Supervision in Petroleum Industry
摘 要:致密油藏目前主要利用水平井压裂进行开发,初期产量较高,地层能量衰减后产量迅速递减,未能实现致密油的长期经济有效动用。针对此问题涌现出了同井缝间注采、拉链式分布驱替等新的技术手段,为了验证此类技术在A油田应用的可行性,在A油田致密油A区块选取天然岩心,进行表面活性剂驱、二氧化碳驱、天然气驱及氮气驱室内岩心驱替实验,明确了不同介质的增油潜力与驱替难度。根据实验结果分析,水驱后使用上述介质能进一步提高驱油效率,提高幅度为9.79%~31.06%,其中二氧化碳驱增幅最大。数据表明,以目前的注入能力及水平井裂缝分布情况来看,要实现致密油驱替,动用储层内的剩余油,只有通过注入气态介质才具备实施的可行性,液压介质受过高的驱替压差制约,暂不具备实施的可行性。At present,tight oil reservoirs are mainly developed by horizontal well fracturing.The initial production is high,and the production declines rapidly after the formation energy decay,which fails to realize the long-term economic and effective use of tight oil.To solve this problem,new technical means such as injection-production between fractures in the same well and zipper distributed displacement have emerged.In order to verify the feasibility of the application of such technologies in oilfield A,natural cores were selected in tight oil block A of oilfield A,and core displacement experiments were carried out in surfactant flooding,carbon dioxide flooding,natural gas flooding and nitrogen flooding to determine the oil increase potential and displacement difficulty of different media.According to the analysis of the experimental results,the oil displacement efficiency can be further improved by using the above medium after water flooding,with the increase range of 9.79%~31.06%,and the increase rate of carbon dioxide is the largest.The data show that,based on the current injection capacity and fracture distribution of horizontal Wells,the implementation of tight oil displacement and the use of remaining oil in the reservoir is feasible only by injecting gas media,and the implementation of hydraulic media is not feasible due to the high displacement differential pressure.
分 类 号:TE357[石油与天然气工程—油气田开发工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49