检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:黄凯[1] 魏德为 王恩明 刘金忠 HUANG Kai;WEI Dewei;WANG Enming;LIU Quanzhong(China Construction Eighth Bureau Third Construction Co.Ltd.,Nanjing 210046,China)
机构地区:[1]中建八局第三建设有限公司,江苏南京210046
出 处:《天津建设科技》2024年第4期78-80,共3页Tianjin Construction Science and Technology
摘 要:考虑已开挖高水位深基坑砂卵地基透水率高,基坑内降水井成井和封井需在有水环境下施工,成井难度大,降水井封井质量直接影响到工程整体的防水效果,基坑地下水控制难度大。结合实际工程,创新采用液压潜孔钻机成井技术和遇水膨胀阻水木塞降水井复合封井技术,可克服有水作业环境施工难度大、基层砂卵石地层钻机成孔难度大、封井难度大等施工难点,降水井成井效果好、施工效率高,封井质量优、防渗漏效果好。High water level deep foundation pit has a high permeability of sand and gravel formation.The completion and sealing of dewatering wells in the foundation pit require construction in a watery environment,which is diffi⁃cult to complete.The quality of dewatering well sealing directly affects the overall waterproof effect of the proj⁃ect,and it is difficult to control groundwater in the foundation pit.Combined with engineering practice proj⁃ects,it has been proven that the innovative use of hydraulic down-hole drilling rig completion technology and water swelling water blocking wooden plug dewatering well composite sealing technology can overcome con⁃struction difficulties such as large construction difficulties in water operating environments,large drilling diffi⁃culties in sandy gravel formation at the base layer,and large well sealing difficulties.The dewatering well com⁃pletion is effective,the construction efficiency is high,the well sealing quality is excellent,and the leakage prevention is effective.
关 键 词:已开挖基坑 桩锚支护结构 砂卵地基 潜孔钻机成孔 封井
分 类 号:TU753[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222