作 者:于继光 Yu Jiguang(Third Engineering Limited,China Railway 18th Bureau Group Corporation Limited,Zhuozhou 072750,China)
机构地区:[1]中铁十八局集团第三工程有限公司,河北涿州072750
出 处:《市政技术》2024年第9期146-151,共6页Journal of Municipal Technology
基 金:中铁十八局集团有限公司2022年度科研创新项目(C2022-051);中国铁建股份有限公司2022年度科技研究开发计划及资助课题(2022-C1)。
摘 要:半盖挖法是目前地铁车站基坑施工常用的施工工艺之一,能够有效保证地面交通的正常通行,但同时也导致采用半盖挖法处的车站基坑盾构始发困难。因此,依托山东省济南市地铁4号线燕山立交桥东站的盾构始发施工,针对盾构机等大型机具的吊装下井、盾构机组装和井下平移等环节进行了分析;总结了盾构机吊装、平移的施工步骤,确定了平移轨道的铺设以及平移托架的布置等施工技术要点,验算了平移托架以及顶推油缸的作用力与承载力;同时进行了风险因素分析,提出了盾构机在吊装时出现高空坠落、平移时出现倾覆或机械伤害时的应对措施。该盾构机井下平移方案对于类似大直径盾构始发施工具有参考意义。Semi-covered excavation method is one of the commonly construction techniques for subway station pit construction,which can effectively ensure the normal passage of ground traffic.But at the same time,it also causes the difficulty of shield launching.Relying on the construction of Yanshan Interchange East Station of Jinan Metro Line 4 in Shandong Province,the lifting&taken down the shaft,shield assembly and underground translation and other links of the shield and other large-scale equipment are analyzed;The construction steps of shield lifting and translation are summarized.The technical points of the laying and arrangement of the translation track are determined.The force and bearing capacity of the translation bracket and the jacking cylinder are calculated.At the same time,risk factors are analyzed.The countermeasures are proposed in case of fall of shield machine from height during lifting,overturning of shield structure or mechanical injuries during translation.The proposed schme is of reference significance for similar large-diameter shield launching construction.
关 键 词:地铁 半盖挖法 盾构始发 盾构机吊装 盾构机平移
分 类 号:U455.43[建筑科学—桥梁与隧道工程] U231.4[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222