首钢水钢炼铁管2号皮带跑偏原因分析及处理  

Cause Analysis and Treatment of No.2 Tubular Belt Deviation in Shougang Shuigang Ironmaking Plant

在线阅读下载全文

作  者:王兴 Wang Xing(Industrial Department of Ironmaking,Shougang Shuicheng Iron&Steel(Group)Co.,Ltd.,Liupanshui 553028,Guizhou,China)

机构地区:[1]首钢水钢炼铁事业部,贵州六盘水553028

出  处:《水钢科技》2024年第3期1-3,共3页Shuigang Science & Technology

摘  要:通过对管二号皮带跑偏原固分析,提出相对应措施和管理手段解决皮带跑偏问题。同时采购电动葫芦等工具,代替传统的吊装方式,确保管二号皮带运行正常,以满足高炉对返矿正常的输出。Based on the analysis of the causes of No.2 tubular belt deviation,the cor-responding measures and management means are put forward to solve the problem of belt deviation.At the same time,electric hoist and other tools are purchased to replace the traditional hoisting method to ensure the normal operation of No.2 tubular belt,so as to meet the normal output of blast furnace to return ores.

关 键 词:管二号皮带跑偏 原因分析 处理 

分 类 号:TH2[机械工程—机械制造及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象