检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:宿宾[1] SU Bin
机构地区:[1]山西省水利水电勘测设计研究院有限公司,山西太原030024
出 处:《山西水利科技》2024年第3期36-39,共4页Shanxi Hydrotechnics
摘 要:根据王家会集运站与三川河的位置关系,基于后大成水文站洪峰流量的计算成果,利用水文比拟法推算王家会集运站站址处设计断面洪水,采用两种方法考虑水库对设计断面洪水的影响,最终分析确定集运站站址处设计洪峰流量。Based on the location relationship between Wangjiahui consolidation station and Sanchuan River,and according to the calculation results of flood peak flow at Houdacheng Hydrological Station,the hydrological analogy method was used to calculate the design section flood at the Wangjiahui consolidation station site.Two methods were used to consider the impact of the reservoir on the design section flood,and the design flood peak flow at the consolidation station site was analyzed and determined.
分 类 号:TV122[水利工程—水文学及水资源] TV85
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.171