BFM生物集效工艺的设计与应用  

Design and Application of Intensive and Efficient BFM Process

在线阅读下载全文

作  者:陈达钊 彭一佳 叶定豪 李志伟 张晶晶 赵廷 韩文杰 CHEN Dazhao;PENG Yijia;YE Dinghao;LI Zhiwei;ZHANG Jingjing;ZHAO Ting;HAN Wenjie(Zhaoqing Zhaoshui Sewage Treatment Co.,Ltd.,Zhaoqing 526060,China;Qingdao Spring Water Treatment Co.,Ltd.,Qingdao 266510,China;Qingdao Jimo District Drainage and River Management Service Center,Qingdao 266299,China)

机构地区:[1]肇庆市肇水污水处理有限公司,广东肇庆526060 [2]青岛思普润水处理股份有限公司,山东青岛266510 [3]青岛市即墨区排水和河道管理服务中心,山东青岛266299

出  处:《净水技术》2024年第9期165-172,共8页Water Purification Technology

基  金:泰山产业领军人才工程专项(tscx202211036);青岛市高新技术企业上市培育库在库企业技术创新项目(23-2-2-gpssyf-14-qiye)。

摘  要:广东某污水处理项目出水标准由一级B提升至一级A。该项目占地紧缺,需原池改造,且需要在60 d之内完成施工和通水达标。鉴于此情况,最终采用纯膜移动床生物膜反应器(MBBR)与超效分离协同的BFM(BioFilm&Magnetic)工艺,高效集约,出水CODCr、BOD5、氨氮、TN、SS、TP的均值分别为(14.0±4.2)、(2.5±0.2)、(1.1±0.9)、(10.7±2.0)、(4.1±1.4)、(0.1±0.1)mg/L,稳定达到设计标准。好氧悬浮载体实现了硝化菌的有效富集,保障了氨氮的有效去除;缺氧悬浮载体实现了反硝化菌的有效富集,保障了TN的达标排放。该污水处理升级改造项目运行电费为0.167元/m^(3),直接运行费用为0.42元/m^(3),为后期该类项目的实施提供了技术借鉴。In order to upgrade the effluent standard from level 1 B to level 1 A,a wastewater treatment plant with limit land occupation in Guangdong Province adopted the BFM(BioFilm&Magnetic)process combined of pure moving bed biofilm reactor(MBBR)and super-efficiency separation process to realize original pool reconstruction.The project implementation time is less than 60 days.In view of this situation,the BFM process of pure membrane moving bed biofilm reactor(MBBR)and super-efficient separation are finally adopted.The average effluent of CODCr,BOD5,ammonia nitrogen,TN,SS and TP is(14.0±4.2),(2.5±0.2),(1.1±0.9),(10.7±2.0),(4.1±1.4),(0.1±0.1)mg/L,respectively,and reach the designed discharge standard steadily.The project construction is rapid,and the land occupation is compact.The engineering cost is low due to the original pool reconstruction.Aerobic suspended carrier realizes the effective enrichment of nitrifying bacteria and ensures the effective removal of ammonia nitrogen.Anoxic suspended carrier realizes the effective enrichment of denitrifying bacteria and ensures the standard discharge of total nitrogen.The electricity cost of the project is 0.167 yuan/m^(3),and the direct operating cost is 0.42 yuan/m^(3),which provided a technical reference for the implementation of such projects in the future.

关 键 词:移动床生物膜反应器(MBBR) 超效分离 悬浮载体 原池改造 硝化菌 

分 类 号:TU992[建筑科学—市政工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象