检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:闫勇琦 孙广 孙亚杰 李兵 YAN Yongqi;SUN Guang;SUN Yajie;LI Bing
机构地区:[1]北京优奈特能源工程技术有限公司,北京100020 [2]秦皇岛市抚宁区骊城热力有限公司,河北秦皇岛066300
出 处:《煤气与热力》2024年第9期14-18,共5页Gas & Heat
摘 要:对大管径供热管道顶管穿越铁路的补偿方案进行对比,补偿方案包括方案1无补偿方案、方案2有补偿方案和方案3自然补偿方案。对管道进行应力分析,管段整体应力水平排序由高到低依次为方案1、方案2、方案3,其中方案1的整体应力水平较高,个别节点应力超标。方案2和方案3均满足应力要求。方案2、方案3的工程造价相差不大,在技术上均可行。从工程施工、运行安全的角度出发,采用方案3。The compensation schemes of large-diameter heating pipeline jacking crossing railway are compared.Compensation schemes include scheme 1 without compensation,scheme 2 compensated and scheme 3 self-compensation.The stress analysis on the pipeline is carried out,and the overall stress level of the pipe section is ranked from high to low as scheme 1,scheme 2 and scheme 3,among them the overall stress level of scheme 1 is higher,and the stress of individual nodes exceeds the standard.Both scheme 2 and scheme 3 meet the stress requirements.The engineering costs of scheme 2 and scheme 3 are not significantly different and both are technically feasible.From the perspective of engineering construction and operation safety,scheme 3 is adopted.
关 键 词:供热管道 顶管穿越铁路 无补偿冷安装 有补偿 自然补偿
分 类 号:TU995.3[建筑科学—供热、供燃气、通风及空调工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.145.158.137