检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:暴入超 朱亚姬 陈擎桢 BAO Ruchao;ZHU Yaji;CHEN Qingzhen(Yellow River Engineering Consulting Co.,Ltd.,Zhengzhou 450003)
机构地区:[1]黄河勘测规划设计研究院有限公司,郑州450003
出 处:《中国防汛抗旱》2024年第9期101-104,共4页China Flood & Drought Management
摘 要:黄河内蒙古河段干流三盛公以下游荡性河段较长,河势摆动剧烈,塌滩塌岸现象普遍,严重危及堤防安全。系统分析了已实施的河道整治工程对河势控制作用,分析了不同河道整治方案的作用、利弊,结合内蒙古河段河道特性及已实施工程效果,提出黄河内蒙古段宜采取微弯型整治与就岸防护措施相结合的模式进行治理,采用二维水沙数学模型对工程建设措施效果进行了验证分析。The main stream of the Yellow River in Inner Mongolia below Sanshenggong has a long wandering section with severe river regime fluctuations and widespread occurrences of beach and bank collapses,seriously endangering the safety of the embankment.This research systematically analyze the control effect of the implemented river regulation project on the river regime,and examine the role,advantages and disadvantages of different river regulation schemes.Based on the characteristics of the Inner Mongolia river section and the effectiveness of the implemented projects,it is proposed that the section should be trained by combining the micro bend regulation with the bank protection measures.The effect of engineering construction measures proposed according to the river regulation scheme is verified and analyzed by using the two-dimensional water and sediment mathematical model.
分 类 号:TV85[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.145.133.121