检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:司青花[1] 宁翰 马力[1] SI Qinghua;NING Han;MA Li(Powerchina Northwest Engineering Corporation,Xi’an 710065,China)
机构地区:[1]中国电建集团西北勘测设计研究院有限公司,陕西西安710065
出 处:《水电与新能源》2024年第9期9-12,共4页Hydropower and New Energy
摘 要:大中型水电站厂用电系统接线复杂,备自投动作逻辑也不简单,同时还需考虑两级备自投之间的动作配合。针对某抽水蓄能电站10 kV及0.4 kV厂用电系统备自投的设计原则、动作逻辑等方面开展了研究,提出两级厂用电系统备自投间的定值及动作时间配合方案,可以保证电站厂用电系统的安全可靠运行。In large and medium scale hydropower stations,the wiring of the auxiliary power system is complex,and the action logic of the automatic switchover backup is also quite complicated.Also,the coordination between the actions of the two-level automatic switchover backups should be considered.A study is thus carried out on the design principles and the action logic of the automatic switchover backup for the 10 kV and 0.4 kV auxiliary power systems in a pumped storage power station.The setting values and the action time coordination scheme are proposed for the automatic switchover backups of the two-level auxiliary power systems,which can ensure the safe and reliable operation of the auxiliary power systems in the station.
关 键 词:抽水蓄能电站 厂用电系统 备自投 设计原则 动作逻辑
分 类 号:TV743[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7