检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈慧敏 王梦雅 汪洋 年夫喜 CHEN Huimin;WANG Mengya;WANG Yang;NIAN Fuxi(Hubei Institute of Water Resources Survey and Design Co.,Ltd.,Wuhan 430070,China)
机构地区:[1]湖北省水利水电规划勘测设计院有限公司,湖北武汉430070
出 处:《水电与新能源》2024年第9期48-51,55,共5页Hydropower and New Energy
摘 要:针对碾盘山水利枢纽工程采用BIM设计,泄水闸的桩基设计具有数量大、桩长不一、工程量难以准确统计,采用传统二维和三维设计进行桩基布置,工作流程繁琐且耗时耗力。基于Dynamo的参数化和模块化功能探索大量桩基的快速布置,实现了大批量桩基的快速建模、出图和工程量统计,减少了人为计算的误差,极大地提高了统计精度,使设计效率与质量显著提升。BIM design is conducted in Nianpanshan Water Conservancy Project.Due to the large quantity,varying pile lengths,and difficulty in engineering quantity calculation in the design of the pile foundation of sluice gates,traditional two-dimensional and three-dimensional pile foundation design and arrangement is complicated and time-consuming.Based on the parameterized and modularized design functions in Dynamo,rapid arrangement of a large number of foundation piles is explored.It achieves the rapid modeling,drawing and engineering quantity statistics of a large number of piles,which greatly reduces the human calculation errors and improves the statistical accuracy,leading to significant improvements in design efficiency and accuracy.
关 键 词:BIM Dynamo for Revit 参数化 碾盘山水利枢纽 桩基
分 类 号:TV652.2[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.222.188.103