Construction of Demonstration Section of HIAF-BRing  

HIAF项目BRing样段建设进展

在线阅读下载全文

作  者:Zheng Yajun Wang Ruliang Zhang Maolin Chen Wei Zhang Xudong Lu Haijiao Xu Xiaowei 郑亚军

机构地区:[1]不详

出  处:《IMP & HIRFL Annual Report》2022年第1期244-244,共1页中国科学院近代物理研究所和兰州重离子研究装置年报(英文版)

摘  要:The High Intensity heavy-ion Accelerator Facility(HIAF)has large scale and multiple systems,which faces many problems such as cross process interfaces,complex construction and installation,high quality requirements,and limited time.Although the overall design of the machinery has carried out a lot of simulated assembly design as well as the whole system and professional BIM(Building Information Modelling)modeling design of HIAF accelerator complex,due to uncontrollable factors such as equipment processing and construction errors,it will bring unpredictable problems to the installation at IMP(Hui Zhou campus).

关 键 词:INSTALLATION IAF ASSEMBLY 

分 类 号:TL56[核科学技术—核技术及应用]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象