检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:邹帅 Shuai Zou(Shanghai Urban Construction Design&Resarch Institute(Group)Co.,Ltd.,Shanghai,200125,China)
机构地区:[1]上海市城市建设设计研究总院(集团)有限公司,上海200125
出 处:《工程设计与施工》2024年第6期50-53,共4页Engineering Design and Construction
摘 要:以竹园污水处理厂项目为背景,从项目方案阶段到施工图出图设计全过程中,各主要专业均采用三维正向技术辅助设计,为提高模型利用效率,研究在符合当前CAD出图规则的前提下,采用Revit软件实现快速的高效率的BIM出图,总结过程经验、技术成果及出图技巧,制定出符合各专业的BIM正向设计流程,制定一般项目出图的视图样板、项目样板、注释族、基础详图族,此外,基于背景工程初步建立BIM出图构件库。Taking the Zhuyuan Sewage Treatment Plant project as the background,from the project proposal stage to the entire process of construction drawing design,each major disciplines adops three-dimensional forward technology to assist the design.In order to improve the efficiency of model utilization,research has been conducted by using Revit to achieve rapid and efficient BIM drawing on the premise of complying with current CAD drawing rules,summarizing process experience,technical achievements,and drawing skills,and develop a BIM forward design process that conforms to various disciplines,develop view templates,project templates,annotation families,and foundation detail families for general project drawings.In addition,preliminarily establish a BIM drawing component library based on background project.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.191.152.135