作 者:冯玉权 Yuquan Feng(CCCC Infrastructure Maintenance Group Co.,Ltd.,Beijing,100011,China)
机构地区:[1]中交基础设施养护集团有限公司,北京100011
出 处:《工程设计与施工》2024年第6期105-107,共3页Engineering Design and Construction
摘 要:以某高速公路连接线1-88米钢管混凝土系杆拱桥为工程依托,通过系统化监控技术手段,实现对桥梁建设过程中的系梁变形、拱肋应力、吊杆张拉力等构件的监测;通过建立Midas/Civil三维模型,对本桥进行全过程有限元模拟,然后将现场实测数据与理论模型计算值进行分析比较。对比发现,在合理的施工顺序及施工监控指导下,实测构件内力与位移与理论计算基本相符,成桥的吊杆力实测值与理论值误差在10%以内,接近设计要求。实现了设计成桥线形与索力。Based on the 1-88-meter concrete filled steel tube pole arch bridge of a highway connecting line,realize the monitoring of beam deformation,arch rib stress and boom tension in the bridge in the whole process,and compare the measured data with the calculated value of the theoretical model.Through comparison,it was found that under the reasonable construction sequence and construction monitoring guidance,the measured internal forces and displacements of the components were basically consistent with the theoretical calculations.The error between the measured and theoretical values of the suspension rod force of the completed bridge was within 10%,which was close to the design requirements.Implemented the design of bridge alignment and cable tension.
分 类 号:U44[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.220.23.205