66kV高压线下底净空临近既有高路堤铁路营运线桩基施工技术  

Construction Technology of Pile Foundation of Existing High Embankment Railway Operating Line Near the Bottom Clearance of 66kV High Voltage Line

在线阅读下载全文

作  者:赵文龙 房书刚 Wenlong Zhao;Shugang Fang(China Railway Electrification Bureau Group Co.,Ltd.,Beijing,100071,China)

机构地区:[1]中铁电气化局集团有限公司,北京100071

出  处:《工程设计与施工》2024年第7期44-46,共3页Engineering Design and Construction

摘  要:随着中国经济的飞速发展,交通运输铁路也越来越多,高压线及临近高路堤铁路下施工工程难度不言而喻。66kV高压线下底净空临近既有高路堤铁路营运线桩基施工技术备受关注,以新建铁路用特大桥40#墩及41#墩临近既有高路堤运营铁路和66kV高压线双重不利因素下的桩基工程为背景,对高压线及临近高路堤铁路下钻孔灌注桩施工进行了风险分析,并从施工技术措施、现场管控、应急预案三个方面对施工安全防护进行深入的论述,取得了较好的社会经济效益。With the rapid development of China’s economy,there are more and more traffic and transportation railways,and the difficulty of high voltage line and near high road railway embankment is self-evident.The construction technology of pile foundation for the 66kV high-voltage line under the bottom clearance near the existing high embankment railway operation line has attracted much attention.Taking the pile foundation engineering of the newly-built railway super large bridge piers 40#and 41#near the existing high embankment operation railway and 66kV high-voltage line as the background,a risk analysis was conducted on the construction of bored piles under the high-voltage line and adjacent high embankment railway.In depth discussions were made on construction safety protection from three aspects:construction technical measures,on-site control,and emergency plans,achieving good social and economic benefits.

关 键 词:高压线 高路堤铁路 灌注桩 安全管理 

分 类 号:U41[交通运输工程—道路与铁道工程]

 