检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:周平 方苏 闫童 俞玲 沈良 李启本 ZHOU Ping;FANG Su;YAN Tong;YU Ling;SHEN Liang;LI Qiben(State Grid Songjiang Power Supply Company,SMEPC,Shanghai 201600,China)
机构地区:[1]国网上海市电力公司松江供电公司,上海201600
出 处:《电力与能源》2024年第4期521-524,共4页Power & Energy
摘 要:交直流窜电是变电站直流系统中较为严重的接地故障,极有可能造成保护误动或拒动,严重影响供电可靠性。针对某实际运行的110 kV变电站交直流窜电故障,首先结合保护动作、故障录波情况给出了事故原因分析与故障排查过程;然后进一步结合二次原理图与现场接线情况提出了整改方案,并验证了整改后回路的安全性;最后给出了此类故障的预防措施与建议,可为防范交直流窜电引起保护误动、拒动提供参考。AC-DC transient overvoltage is a severe grounding fault in the DC systems of substations,which can potentially lead to incorrect operation or failure of protection devices,seriously affecting power supply reliability.This paper analyzes a case of AC-DC transient overvoltage fault occurring during the switching operation of a 110 kV substation.Initially,the analysis of the accident cause and fault investigation process is presented based on protection actions and fault waveform records.Subsequently,a rectification plan is proposed combining secondary schematic diagrams and on-site wiring conditions to validate the safety of the revised circuit.Finally,preventive measures and recommendations for avoiding protection misoperation and failure due to AC-DC transient overvoltage are provided.
分 类 号:TM721.1[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.227