检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赵少宗 ZHAO Shaozong
机构地区:[1]上海市政工程设计研究总院(集团)有限公司,上海市200092
出 处:《城市道桥与防洪》2024年第9期63-66,M0008,共5页Urban Roads Bridges & Flood Control
摘 要:石家庄市仓宁路作为石家庄东南三环片区的东向西城市主干路,红线内集齐了道路、桥梁、综合管廊、市政主管线、轨道交通等众多市政元素,跨越环城水系节点更是临近规划地铁站。结合跨越环城水系节点自然建设条件以及水系、园林、轨道、排水等各部门要求的边界条件,分专业展开分析桥梁、综合管廊、排水管线设计方案的可行性,最终确定了仓宁路的总体设计方案。Cangning Road is the main road from east to west of the third ring road in the southeast of Shijiazhuang City.The numerous municipal elements of roads,bridges,utility tunnels,municipal main pipe lines and rail transit are integrated in the red line.The nodes crossing the urban water system are even closer to the planned subway stations.Combined with the natural construction conditions of the nodes crossing the urban water system and the boundary conditions required by various departments such as water system,landscaping,rail and drainage.the feasibility of design schemes for the bridge,utility tunnel and drainage pipeline is analyzed in different disciplines.Finally,the overall design scheme of Cangning Road is determined.
分 类 号:U412[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7