检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:徐振艳 Xu Zhenyan(China Railway Design Group Co.,Ltd.,Tianjin 300042,China)
出 处:《山西建筑》2024年第21期118-122,共5页Shanxi Architecture
摘 要:以城市轨道交通一座车站近临既有市政高架桥施工为背景,利用Plaxis有限元分析软件对桥梁墩台的沉降和变形进行数值分析。并根据实际监控量测结果反馈桥梁墩台沉降和变形。研究结果表明:地铁车站施工期间,既有市政高架桥变形主要为桥梁墩台沉降,沉降随基坑开挖深度增加而逐渐加大,但是基坑开挖到底板施工完毕,降水达到稳定水位时,沉降趋于稳定。桥梁墩台的沉降量远小于地面沉降量。桥梁墩台的倾斜变形和差异沉降引起桥面的转角远小于相应规范的控制要求。In relation to the construction of an urban rail transit stationnear an existing municipal viaduct,the Plaxis finite element analysis softwareis utilized to conduct a numerical analysis of the settlement and deformationof a bridge pier.Feedback on the settlement and deformation ofthe bridge pier and ground settlement was provided according to actualmonitoring and measurement results.The findings indicate that during subwaystation construction,the deformation of the existing municipal viaduct isprimarily attributed to bridge pier settlement,which gradually increases withdeeper excavation of the foundation pit but tends towards stability onceexcavation reaches a stable water level.Bridge pier settlement is significantlyless than ground settlement.Inclined deformation and differential settlementof the bridge pier result in an angle for the bridge deck that falls well belowcorresponding code requirements.It can be concluded that protective measuresfor bridge pile in subway station foundation pit construction are effective andsafe.
关 键 词:基坑施工 桥梁墩台 数值分析 倾斜变形 差异沉降 地面沉降
分 类 号:TU997[建筑科学—市政工程] U445.55[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7