检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:段飞 Duan Fei(Northwest Research Institute of Engineering Investigations and Design,Xi'an 710082,Shaanxi Province,China)
机构地区:[1]西北综合勘察设计研究院,陕西西安710082
出 处:《建筑与装饰》2024年第18期139-141,共3页Construction & Decoration
摘 要:隧道施工期的变形监测与预警对于确保隧道施工的安全与顺利进行具有重要意义。本文以拱北隧道为例,探讨了基于人工与自动化监测技术融合的隧道施工期变形监测与预警系统的设计与研究。首先对隧道施工期变形监测技术进行了综述,其次介绍了拱北隧道工程的概况并对施工期变形情况进行分析,阐述了监测需求,最后设计了基于人工与自动化监测技术融合的隧道施工期变形监测系统。Deformation monitoring and early warning during tunnel construction is of great significance to ensure the safe and smooth progress of tunnel construction.Taking the Gongbei Tunnel as an example,this paper discusses the design and research of deformation monitoring and early warning system during tunnel construction based on the integration of manual and automatic monitoring technology.Firstly,the deformation monitoring technology during tunnel construction is reviewed;Subsequently the general situation of Gongbei Tunnel project is introduced,the deformation during construction is analyzed,the monitoring requirements are expounded;Finally,the deformation monitoring system during tunnel construction is designed based on the integration of manual and automatic monitoring technology.
关 键 词:隧道施工期 变形监测 预警系统 人工监测技术 自动化监测技术
分 类 号:U45[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28