检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:姜茵 陈明泽 Jiang Yin;Chen Ming-ze(Hainan Surveying and Mapping Product Quality Supervision and Inspection Station of the Ministry of Natural Resources,Haikou 152000,Hainan Province,China)
机构地区:[1]自然资源部海南测绘产品质量监督检验站,海南海口152000 [2]海口市城市规划设计研究院有限公司,海南海口152000
出 处:《建筑与装饰》2024年第18期193-195,共3页Construction & Decoration
摘 要:在基坑施工过程中,应按相关规范和技术设计对支护结构稳定、地下水位变化、基坑影响范围内的其他建筑、管线的位移等多项监测项目进行周期性变观测,预警基坑变形趋势,正确指导施工,保证基坑的安全施工。本文以某棚户区(城中村)改造项目基坑为例,提出具体的监测项目,逐一分析各项监测结果,判断基坑变形趋势,可为类似工程提供参考。In the process of foundation pit construction,periodic change observation shall be carried out for many monitoring items such as the stability of supporting structure,the change of groundwater level,the displacement of other buildings and pipelines within the scope of influence of the foundation pit according to the relevant specifications and technical design,so as to warn the deformation trend of the foundation pit,correctly guide the construction,and ensure the safe construction of the foundation pit.Taking the foundation pit of a shantytown(village in the city)reconstruction project as an example,this paper proposes specific monitoring items,analyzes the monitoring results one by one,and judges the deformation trend of the foundation pit,which can be used as a reference for similar projects.
分 类 号:TU7[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7