检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]交通运输部天津水运工程科学研究院,天津300456 [2]天津水运工程勘察设计院有限公司,天津300456
出 处:《科技创新与应用》2024年第29期166-169,共4页Technology Innovation and Application
摘 要:海水取水工程的建设包括取水头、取水管道、取水泵站等部分,该文首先对海水取水工艺系统进行介绍,分析各部分的设计要点。然后以某渔业养殖园海水取水工程为例,通过对集中式和分散式取水头部进行设计,对其优缺点进行对比,根据项目的具体情况和实施条件,推荐采用分散式取水头;通过对多种材质的取水管材进行比选,推荐采用HDPE取水管,最后进行水泵选型,为海水渔业养殖取水工程设计提供参考。The construction of seawater water intake project includes water intake head,water intake pipeline,water intake pumping station and so on.This paper first introduces the seawater water intake process system and analyzes the design points of each part.Then,taking the seawater intake project of a fishery culture park as an example,through the design of centralized and decentralized intake heads,their advantages and disadvantages are compared.according to the specific conditions and implementation conditions of the project,the decentralized intake head is recommended;through the comparison and selection of water intake pipes of various materials,HDPE intake pipes are recommended,and finally pump selection is carried out to provide reference for the design of mariculture intake engineering.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.90