检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张学良 赵建平 王丽娟 ZHANG Xueliang;ZHAO Jianping;WANG Lijuan(Power China Kunming Engineering Corporation Limited,Kunming 650051,China)
机构地区:[1]中国电建集团昆明勘测设计研究院有限公司,云南昆明650051
出 处:《云南水力发电》2024年第9期24-26,共3页Yunnan Water Power
摘 要:为了保证高速公路的安全正常运行,必须要掌握下穿隧洞施工对地层的扰动和支护结构的受力情况。结合滇中引水工程香炉山隧洞实体工程的现场监控量测,介绍了相关监测方案及其监测结果。成果显示:隧道施工过程中,围岩变形趋于稳定,钢拱架和二衬内力的安全系数均满足设计规范要求,说明隧道施工方案合理,工程结构稳定可靠,所用传感器有效完成相关监测任务。In order to ensure the safe and normal operation of highways,it is necessary to grasp the disturbance of the strata and the stress situation of the support structure caused by the construction of underpass tunnels.Based on the on-site monitoring and measurement of the Xianglushan Tunnel physical project of Central Yunnan Water Diversion Project,this paper introduces the relevant monitoring schemes and their monitoring results.The results indicate that during the tunnel construction process,the deformation of the surrounding rock tends to stabilize,and the safety factors of the internal forces of the steel arch and secondary lining meet the design specifications.It indicates that the tunnel construction plan is reasonable,the engineering structure is stable and reliable,and the sensors used effectively complete the relevant monitoring tasks.
分 类 号:TV554[水利工程—水利水电工程] P642.26[天文地球—工程地质学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.85