作 者:王军 梁岩 张楚 WANG Jun;LIANG Yan;ZHANG Chu(POWERCHINA SINOHYDRO ENGINEERING BUREAU 14 CO.,LTD.,Kunming 650041,China)
机构地区:[1]中国水利水电第十四工程局有限公司,云南昆明650041
出 处:《云南水力发电》2024年第9期93-96,共4页Yunnan Water Power
摘 要:依托某引水发电系统水电站地下厂房工程,通过预应力长锚杆支护施工,采用高强砂浆进行锚固,减少了与其他作业间的干扰,缩短了支护工期,迅速有效的抑制了因大跨度洞室开挖后引起施工过程中的围岩变形,恢复围岩的整体受力状态,提高了洞室开挖后的整体稳定性,有效保障了施工及运营期安全。The underground powerhouse project of a water diversion and power generation system hydropower station is supported by prestressed long anchor rods and anchored with high-strength mortar.It reduces interference with other operations,shortens the support period,quickly and effectively suppresses the deformation of the surrounding rock caused by the excavation of large-span caverns during the construction process,restores the overall stress state of the surrounding rock,improves the overall stability of the caverns after excavation,and effectively ensures construction safety and operation period.
分 类 号:TV554.12[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.33