检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:董书礼 于谦 DONG Shuli;YU Qian(POWERCHINA SINOHYDRO ENGINEERING BUREAU 14 CO.,LTD.,Kunming 650041,China)
机构地区:[1]中国水利水电第十四工程局有限公司,云南昆明650041
出 处:《云南水力发电》2024年第9期138-143,共6页Yunnan Water Power
摘 要:趾板是整个混凝土面板堆石坝防渗系统的重要组成部分,可保证面板与坝基间的不透水连接。趾板基础是重要隐蔽工程之一,做好趾板基础开挖的质量控制工作,对于趾板施工非常重要。如果质量管理出现问题,很容易造成欠挖、超挖、尺寸不合理以及基础移位等各种各样的问题,从而对工程质量产生影响。所以大坝趾板基础开挖施工要严格按照设计和规范进行,现场施工要操作程序化、规范化,确保工程施工质量。Toe slab is an important component of the anti-seepage system of the entire concrete face rockfill dam,which can ensure an impermeable connection between the face slab and the dam foundation.Toe board foundation is one of the important concealed works.It is very important to do a good job in quality control of toe board foundation excavation for toe board construction.If there are problems with quality management,it is easy to cause various problems such as under excavation,over excavation,unreasonable dimensions,and foundation displacement,which can have an impact on the quality of the project.Therefore,the excavation construction of the dam toe slab foundation must be strictly carried out in accordance with the design and specifications,and onsite construction must be operated in a standardized and procedural manner to ensure the quality of the project construction.
分 类 号:TV523[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:13.59.235.245