检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王姗姗 陈为雄 WANG Shanshan;CHEN Weixiong(Power China Kunming Engineering Corporation Limited,Kunming 650051,China)
机构地区:[1]中国电建集团昆明勘测设计研究院有限公司,云南昆明650051
出 处:《云南水力发电》2024年第9期186-189,共4页Yunnan Water Power
摘 要:随着三维设计技术的迅猛发展,CAD\CAE集成开发设计已经影响着各行各业,对水电设计行业亦是如此。以溢流坝段为例,在三维CAD软件中建立参数化、自动化、智能化建模,再导入CAE软件中进行计算分析及结构优化设计。结合三维CAD软件强大的可视化、参数化、智能化功能和CAE软件强大的计算、分析、模拟及仿真功能,可极大地提高设计效率、质量和水平,是水利水电行业今后设计和研究的发展方向。With the rapid development of 3D design technology,CAD\CAE integrated development design has affected all walks of life,hydraulic engineering as well.The power intake tower of hydropower-station are modelled by 3D design software to make parametric design models in this Paper,then the model is solved and optimized design of its structure in the ANSYS Workbench.With the help of the function of 3D design software’s powerful visualization,parametric and collaboration capabilities and CAE software’s strong computing,analysis,modeling and simulation capabilities;the efficiency,quality and level of our design be greatly improved.
关 键 词:CAD\CAE 智能化设计 ANSYS Workbench Flow-3D 集成应用
分 类 号:TV222[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.223.169.109