作 者:童俊伟 丰术 TONG Jun-wei;FENG Shu(China Mobile Group Zhejiang Co.,Ltd.Jinhua Branch,Jinhua 321000,China)
机构地区:[1]中国移动通信集团浙江有限公司金华分公司,金华321000
出 处:《电信工程技术与标准化》2024年第9期89-92,共4页Telecom Engineering Technics and Standardization
摘 要:随着数据中心建设规模越来越大,用电能耗增加,大型数据中心常自备变电站,一般采用220kV和110kV电压等级供电,再通过自备电站的10kV馈线送至各数据楼。本文通过重点分析电缆进线方式下无功补偿装置的设置,从而降低数据中心建设投资和运行成本。With the increasing scale of data center construction and electricity consumption,large data centers often have their own substations,which use 220 kV and 110 kV to introduce two power sources,and then send them to various data buildings through the 10 kV voltage level from self-contained power station.This article focuses on analyzing how to set up reactive power compensation devices under the cable entry method and reduce investment and operating costs in data center construction.
分 类 号:TN929.5[电子电信—通信与信息系统]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.171