检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张岩岩 王电华 刘子嫣 张萌 李逸晨 张家玺 ZHANG Yanyan;WANG Dianhua;LIU Ziyan;ZHANG Meng;LI Yichen;ZHANG Jiaxi(Beijing Rail and Transit Design and Research Institute Co.,Ltd.,Beijing 100068,China;Beijing Rail and Transit Engineering Technology Research Center,Beijing 100068,China;Xi'an Rail Transit Group Co.,Ltd.,Xi'an 710018,China)
机构地区:[1]北京市轨道交通设计研究院有限公司,北京100068 [2]北京市轨道交通工程技术研究中心,北京100068 [3]西安市轨道交通集团有限公司,陕西西安710018
出 处:《现代信息科技》2024年第17期150-154,共5页Modern Information Technology
摘 要:在施工过程中,时态数据是模拟施工进度的基础。在三维空间数据的基础上加入时间维度,基于多维时态数据对地铁施工进度进行时空数据处理,并直接应用于地铁施工进度模拟,能充分表达随时间变化地铁施工过程的动态,便于进度的动态查询与分析,这对在地铁工程中指导和管理施工具有极大的现实意义。文章首先介绍了时态数据的概念以及在施工进度模拟中应用的关键技术,然后以轨道交通BIM数据集成与工程管理平台为案例,阐述了时态数据的采集、操作和处理过程,表达时态属性数据变化的方法。最后利用三维可视化技术对施工过程进行了模拟,研究结果表明时态数据模型在地铁施工过程中的模拟有重要意义。During the construction process,temporal data is the foundation of simulating construction progress.On the basis of three-dimensional spatial data,the time dimension is added,and the spacetime data processing of subway construction progress is carried out based on multi-dimensional temporal data,and it is directly applied to subway construction progress simulation.It can fully express the dynamics of subway construction process changing with time,and it is convenient for dynamic query and analysis of progress,which has great practical significance for guiding and managing construction in subway engineering.Firstly,the paper introduces the concept of temporal data and key technology applied in construction progress simulation.Secondly,it uses the case of the rail transit BIM data integration and project management platform to illustrate the collection,manipulation and processing of temporal data,and outline the methods for expressing changes in temporal attribute data.Finally,it utilizes three-dimensional visual technique to simulate the construction process,and research results indicate that the simulation of the temporal data model in the subway construction process is of great significance.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49