检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王枝龙 WANG Zhilong(Shenzhen Ecological Environment Bureau Pingshan Administration,Shenzhen 518000,China)
机构地区:[1]深圳市生态环境局坪山管理局,广东深圳518000
出 处:《中国厨卫》2024年第9期256-258,共3页Chinese Kitchen & Bathroom
摘 要:建设项目的环境影响评价与竣工环保验收工作是确保环境可持续性的关键步骤,但在实际操作中存在协调性问题。因此,文章分析了环境影响评价与竣工环保验收中的信息不连续、监管困难和技术滞后等问题,并提出了增强监控、提高透明度和利用现代技术等解决措施,以期优化环境影响评价与竣工环保验收的效率和效果。bstract:Environmental impact assessment and completion environmental acceptance of construction projects are key steps to ensure environmental sustainability,but there are coordination issues in practical operation.Therefore,the article analyzes the problems of information discontinuity,regulatory difficulties,and technological lag in environmental impact assessment and completion environmental acceptance,and proposes solutions such as enhancing monitoring,improving transparency,and utilizing modern technology to optimize the efficiency and effectiveness of environmental impact assessment and completion environmental acceptance.
关 键 词:环境影响评价 竣工环保验收 监管挑战 信息技术 政策实施
分 类 号:X822[环境科学与工程—环境工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49