检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张生安 温欣[2] 陈星[2] 刘桂莲[1] ZHANG Sheng-an;WEN Xin;CHEN Xing;LIU Gui-lian(School of Chemical Engineering and Technology,Xi′an Jiaotong University,Xi′an 710049,China;The First Gas Plant of Changqing Oilfield Company,PetroChina,Yulin 718500,China)
机构地区:[1]西安交通大学化学工程与技术学院,陕西西安710049 [2]中国石油长庆油田分公司第一采气厂,陕西榆林718500
出 处:《石化技术与应用》2024年第5期364-370,共7页Petrochemical Technology & Application
基 金:国家自然科学基金资助项目(项目编号:22078259)。
摘 要:针对某450万m^(3)/d天然气净化装置,利用Aspen HYSYS软件对天然气脱硫脱碳和脱水工艺进行建模,基于夹点技术分析天然气净化装置的换热网络节能潜力和不合理换热之处,基于灵敏度分析操作参数节能潜力,确定甲基二乙醇胺(MDEA)和三甘醇(TEG)溶剂的最佳循环量。结果表明:通过夹点技术分析,天然气净化装置换热网络的节能潜力为307.80 kW,占现行加热公用工程和冷却公用工程消耗量的4.97%,5.65%;通过灵敏度分析,MDEA和TEG的循环量分别取95.00,5.00 m^(3)/h,操作参数优化的最大节能潜力为2527.95 kW,占现行加热公用工程和冷却公用工程消耗量的40.86%,46.43%;通过换热网络改造和操作参数优化,装置最大节能量为2795.41 kW,占现行加热和冷却公用工程消耗量的45.18%,51.34%;2种节能优化方案可节省操作费用144.72万元/a,回收期为0.174 a。For a natural gas purification plant with a capacity of 4.5 million m^(3)/d,Aspen HYSYS software was used to model the natural gas desulfurization,decarbonization,and dehydration processes.Based on the pinch technology,the energy-saving potentials and unreasonable heat transfer of the heat exchange network of the process were analyzed.Based on the operational energy-saving potentials through sensitivity analysis,the optimal cycle flow rate of MDEA and TEG solvents could be determined.The results showed that the energy-saving potentials of the natural gas purification plant′s heat exchange network was 307.80 kW,corresponding to 4.97%and 5.65%of the current heating and cooling utilities consumption.Through sensitivity analysis,the cycle flow rate of MDEA and TEG were 95.00 m^(3)/h and 5.00 m^(3)/h,and the maximum energy-saving potentials of operation parameter optimization was 2527.95 kW,accounting for 40.86%and 46.43%of the current heating and cooling utilities consumption.According to the heat exchange network retrofit and the optimization of operating parameters,the maximum energy-saving values of the process was 2795.41 kW,corresponding to 45.18%and 51.34%of the current heating and cooling utilities consumption.For the proposed two energy-saving optimization schemes,the annual operating cost savings was 1447.2 thousand Yuan/a,and the recovery period was 0.174 a.
关 键 词:天然气净化 脱硫脱碳 脱水 节能分析 夹点技术 灵敏度分析 模拟优化
分 类 号:TE646[石油与天然气工程—油气加工工程] TE319
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222