检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈鹏 CHEN Peng(Chongqing Wanzhou Construction Engineering Management Co.,Ltd.,Chongqing 404000,China)
机构地区:[1]重庆万州建设工程管理有限公司,重庆404000
出 处:《工程技术研究》2024年第13期121-123,共3页Engineering and Technological Research
摘 要:简支梁变连续梁是目前桥梁施工中较为常用的一种施工技术,该技术可以节省施工时间,保障施工进度,确保施工路面平顺,利于车辆通行。但简支变连续梁施工技术在实施过程中也存在诸多问题,文章研究了简支变连续梁施工控制技术,对简支变连续梁桥施工变量因素进行分析,提出负弯矩区域施工控制及施工线形控制技术等,旨在为工程施工提供一定参考。Simply-supported beam to continuous beam is a common construction technology in bridge construction at present.This technology can save construction time,ensure construction progress,ensure smooth construction pavement and facilitate vehicle passage.However,there are also many problems in the implementation process of simply-supported to continuous beam construction technology.This paper studies the construction control technology of simply-supported to continuous beam,analyzes the construction variable factors of simplysupported to continuous beam bridge,and puts forward the construction control in negative bending moment areas and construction linear control technology,so as to provide some reference for engineering construction.
关 键 词:简支变连续梁桥 预应力张拉 负弯矩区域 线形控制
分 类 号:U445.4[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.189.185.100