检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李明 田程 刘婕[2] LI Ming;TIAN Cheng;LIU Jie(Tianjin Water Planning Survey and Design Co.,Ltd.,Tianjin 300204,China;Tianjin Puze Engineering Consulting Co.,Ltd.,Tianjin 300204,China)
机构地区:[1]天津市水务规划勘测设计有限公司,天津300204 [2]天津普泽工程咨询有限责任公司,天津300204
出 处:《工程技术研究》2024年第13期201-203,共3页Engineering and Technological Research
摘 要:在现代水利工程中,泵站设施以水资源调配为功能定位,有利于充分挖掘节水潜力、缓解水资源供需矛盾、改善农业生产条件。泵站运行直接关系到水利工程建设效果,鉴于此,文章分析了水利泵站的优化设计措施,并探讨了运行控制措施,旨在切实改善水利泵站运行条件,大力发展高效节水项目,取得更加显著的综合效益。In modern water conservancy engineering,pumping station facilities take water resource allocation as the function orientation,which is conducive to fully tapping the potential of water conservation,alleviating the contradiction between supply and demand of water resources,and improving agricultural production conditions.The operation of pumping station is directly related to the effect of water conservancy engineering construction.In view of this,this paper analyzes the optimization design measures of water conservancy pumping station,and discusses the operation control measures,aiming at effectively improving the operation conditions of water conservancy pumping station,vigorously developing efficient water-saving projects,and achieving more significant comprehensive benefits.
分 类 号:TV512[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:52.14.186.84