作 者:潘丰 PAN Feng(Shanghai Highway and Bridge(Group)Co.,Ltd.,Shanghai 200000,China)
机构地区:[1]上海公路桥梁(集团)有限公司,上海200000
出 处:《工程技术研究》2024年第13期223-225,共3页Engineering and Technological Research
摘 要:南京某竖井项目采用了机械掘进悬吊拼装竖井施工工法(SAM工法),基于该工艺的竖井,具有开挖深度深、须为水下封底形式的特点。文章计算了封底混凝土扩散半径及首封混凝土量,从清底、封底平台安装、导管选用、水下混凝土浇筑等环节出发,总结了封底流程及关键技术,以供参考。A shaft project in Nanjing adopts the Suspended Segmental Shaft Automatic Mechanical method(SAM method).The shaft based on this process has the characteristics of deep excavation depth and underwater bottom sealing form.The diffusion radius of bottom sealing concrete and the amount of first sealing concrete are calculated.Starting from the bottom cleaning,bottom sealing platform installation,duct selection,underwater concrete pouring and other links,the bottom sealing process and key technologies are summarized for reference.
分 类 号:U455.8[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7