检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:臧德梁 Zang Deliang(Ningxia Hongdunzi Coal Industry Co.,Ltd.,Ningxia Yinchuan 750000)
机构地区:[1]宁夏红墩子煤业有限公司,宁夏银川750000
出 处:《山东煤炭科技》2024年第9期147-151,共5页Shandong Coal Science and Technology
摘 要:针对红一煤矿矿井水文地质复杂、断层多、采掘工作面涌水量大、导水断裂带发育等问题,以首采面1150401工作面为例,通过相似材料模拟试验的方法,从煤岩物理力学参数测试、两顺槽围岩松动圈探测及支架工作阻力分析,研究得出首采面初次来压、周期来压步距、超前采动影响范围及超前采动裂隙发育情况。研究结果为红一煤矿乃至红墩子矿区安全生产、防治水工作提供了重要的技术支撑。In view of the problems of complex hydrogeological,multiple faults,large water inflow in the mining and excavation working face,the development of water conducting fault zones and so on in Hongyi Coal Mine,taking the first mining face 1150401 working face as an example,the method of similar material simulation experiment is conducted to study the initial pressure,periodic pressure step distance,impact range of advanced mining,and fissures development situation of advanced mining in the first mining face through testing of coal rock physical and mechanical parameters,detection of the loose circle of the surrounding rock in the two crossheadings,and analysis of bracket working resistance.The research results provide important technical support for the safety production and water prevention and control work in Hongyi Coal Mine and even Hongdunzi mining area.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.133.147.169