作 者:潘俊[1] 滕炳麓 PAN Jun;TENG Binglu(School of Municipal and Environmental Engineering,Shenyang Jianzhu University,Shenyang,China,110168;Key Laboratory of Integrated Management of Shallow Lakes and Resource Development,Ministry of Education,Hohai University,Nanjing,China,210098;College of Environment,Hohai University,Nanjing,China,210098)
机构地区:[1]沈阳建筑大学市政与环境工程学院,辽宁沈阳110168 [2]河海大学浅水湖泊综合治理与资源开发教育部重点实验室,江苏南京210098 [3]河海大学环境学院,江苏南京210098
出 处:《沈阳建筑大学学报(自然科学版)》2024年第5期945-951,共7页Journal of Shenyang Jianzhu University:Natural Science
基 金:国家自然科学基金项目(51908377)。
摘 要:目的 研究利用雨洪资源解决干旱地区用水短缺问题,提出利用河槽暗蓄收集雨洪最佳工程方案,为该类工程的设计提供参考。方法 应用Visual Modflow软件模拟研究辽西喀左地区内第二牤牛河流域中不同调蓄方案和拦蓄入渗方案对河槽暗蓄雨洪资源化的影响。结果 通过不同调蓄方案的对比,采用可调控悬挂截渗坝代替现有截渗坝时,雨洪资源利用率可提高至20.3%;通过不同拦蓄入渗方案的对比,“不清河床+坑塘+拦水堰”方案的雨洪资源入渗量为天然条件下雨洪资源入渗量100倍以上。结论 河槽暗蓄雨洪资源化工程最佳的拦蓄入渗和调蓄组合方案为在“不清河床+坑塘+拦水堰”的情况下采用可调控悬挂截渗坝,可显著提高雨洪资源利用率。This paper was proposed to study the use of rainwater resources to solve the problem of water shortage in arid areas,and to propose the use of river channel concealed storage to collect rainwater,and to find out the working conditions,so as to provide a reference for the design of this kind of project.Visual Modflow software was applied to simulate and study the effects of different regulation schemes and detention and infiltration schemes on rainwater resources collection by river channel dark storage in the second downstream oxbows river basin within the Kazuo area of Liaoxi.The rainwater resource utilization rate can be increased to 20.3% when the existing check dam is replaced by an adjustable suspension check dam by comparing different storage schemes;the rainwater resource infiltration amount of the "unclean riverbed+pit pond+check weir" scheme is more than 100 times of that of the natural condition by comparing different storage and infiltration schemes.The infiltration volume of rainwater resources is more than 100 times that of rainwater resources under natural conditions.The best combination of storage and infiltration and storage in the river channel dark storage rainwater resource project is the use of adjustable suspension interception dams in the case of "unclear riverbed+pit ponds+interception weir",which can significantly improve the utilization rate of rainwater resources.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.225.234.109