作 者:姜吉坤 刘紫君[1] 顾志恒 李春阳[4] JIANG Jikun;LIU Zijun;GU Zhiheng;LI Chunyang(School of Management Engineering,Qingdao University of Technology,Qingdao 266520,China;University Research Center for Smart City Construction and Management of Shandong Province,Qingdao University ofTechnology,Qingdao 266520,China;Ocean University of China,Qingdao 266000,China;Qingdao Construction Safety Supervision Station,Qingdao 266000,China)
机构地区:[1]青岛理工大学管理工程学院,山东青岛266520 [2]青岛理工大学山东省高校智慧城市建设管理研究中心,山东青岛266520 [3]中国海洋大学,山东青岛266000 [4]青岛市建筑施工安全监督站,山东青岛266000
出 处:《武汉大学学报(工学版)》2024年第9期1251-1260,共10页Engineering Journal of Wuhan University
基 金:国家自然科学基金项目(编号:71471094);山东省重点研发计划(软科学项目)一般项目(编号:2019RKB01459)。
摘 要:为提高装配式建筑吊装施工安全水平,准确判断吊装施工安全风险等级及等级趋势,构建了改进的变权物元可拓模型。在事故致因理论基础上从“人、物、技术、管理、环境”5个方面构建吊装施工安全风险评价指标体系;利用变权理论确定风险指标权重,改进物元可拓模型对吊装施工进行安全风险评价,将贴近度原则与物元可拓模型相结合确定风险等级,解决了以往无法反映装配式建筑吊装施工安全对风险等级界限的模糊性问题。以青岛某装配式建筑项目为例对模型进行了验证,结果表明:该项目吊装作业安全风险等级为较低风险,但略有偏向于中等风险的趋势,与传统风险等级评估方法对比,风险评估结果一致,验证了模型的可行性。In order to improve the safety level of hoisting construction of prefabricated buildings,and accurately judge the safety risk level and level trend of hoisting construction safety risk,an improved matter-element extension model with variable weight is constructed.Based on accident cause theory,the safety risk evaluation index system of hoisting construction is constructed from five aspects:human,material,technology,management and environment.The variable weight theory is used to determine the risk index weight,the safety risk of hoisting operation is evaluated by the improved matter-element extension model.The risk level is determined by combining the proximity principle with the matter-element extension model,and the fuzzy problem of the risk level boundary which could not reflect the fuzziness of risk level boundary of hoisting construction safety of prefabricated buildings in the past is solved.Finally,a prefabricated construction project in Qingdao is taken as an example to verify the model.The results show that the safety risk level of hoisting operation of the project is low,but it is slightly inclined to the trend of medium risk.Compared with the traditional risk level assessment method,the risk assessment results are consistent,which verifies the feasibility of the model.
关 键 词:变权理论 吊装施工 物元可拓模型 安全风险评价 贴近度原则
分 类 号:TU714[建筑科学—建筑技术科学]