检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈慧川 CHEN Hui-chuan(China Nuclear Industry Mechanical Engineering Co.Ltd.,Shanghai 201702,China)
出 处:《工程建设与设计》2024年第18期134-136,共3页Construction & Design for Engineering
摘 要:主要针对核电工程大件吊装技术及风险控制措施进行研究,阐述了大件整体吊装施工技术具有可降低施工风险、缩短工期,以及低能耗、低噪声的优势,探讨某核电工程的大件吊装施工技术要点,从人员、机具以及环境等方面提出风险控制措施。This paper mainly focuses on the large lifting technology and risk control measures of nuclear power engineering,expounds the advantages of large lifting construction technology that can reduce construction risk,shorten construction period,low energy consumption and low noise,discusses the key points of large lifting construction technology of a nuclear power project,and puts forward risk control measures from the aspects of personnel,machinery and equipment and environment.
分 类 号:TU745.7[建筑科学—建筑技术科学] TU758.15
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.171