检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:范轶然 FAN Yiran(State Grid Shanghai Pudong Electric Power Supply Company,Shanghai 200000,China)
出 处:《自动化应用》2024年第18期105-108,共4页Automation Application
摘 要:对于电流互感器,投运前必须进行交接性试验,以保证电流互感器满足工作标准要求。为此,应按照国家标准对校内一台油浸式电流互感器开展交接性试验,分析各种试验方法和特点,验证电流互感器交接性试验各项目试验方法和原理,全面了解设备投运的准入条件,以保证电力设备安全稳定投入使用。For current transformers,a handover test must be conducted before operation to ensure that the current transformers meet the working standard requirements.To this end,a handover test should be conducted on an oil immersed current transformer on campus in accordance with national standards,analyzing various test methods and characteristics,verifying the test methods and principles of each item in handover test of the current transformer,comprehensively understanding the admission conditions for equipment operation,and ensuring the safe and stable use of power equipment.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.137.222.1