检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:牛理国 曹卓 Niu Liguo;Cao Zhuo(Shougang Jingtang Iron&Steel United Co.,Ltd.,Tangshan Hebei 063200,China)
机构地区:[1]首钢京唐钢铁联合有限责任公司,河北唐山063200
出 处:《山西冶金》2024年第8期215-217,共3页Shanxi Metallurgy
摘 要:基于烧结、球团和高炉等工序特点,从优化配矿、高炉配煤和铁水降燃耗等方面进行分析,总结京唐公司铁水降本经验。一是坚持55%以上球比冶炼,结合大风量、高富氧的操作方针,提高冶炼效率。二是优化配矿结构、合理搭配固废资源,提高折扣矿的使用量,增加烧结固废配加量。三是持续强化喷煤降焦,全年焦炭负荷达到5.73,降低了铁水燃料成本。Based on the cost reduction practice of Jingtang blast furnace combined with the characteristics of sintering,pelletizing,and blast furnace processes,this paper summarizes the experience of cost reduction in iron making.The first is to adhere to the principle of smelting with a ball to ball ratio of over 55%,combined with the operation policy of high air volume and high oxygen enrichment,to improve smelting efficiency.Secondly,in terms of raw material blending,increase the use of discounted ore and increase the addition of sintering solid waste.Thirdly,strengthen coal injection to reduce coke consumption,with the annual coke load reaching 5.73,promoting the reduction of iron and fuel costs.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.226.166.121