作 者:黄小平 蒋志坚 黄旭东 朱珍德[2] Huang Xiaoping;Jiang Zhijian;Huang Xudong;Zhu Zhende(Shenzhen Water Planning and Design Institute Co.,Ltd.,Water Engineering Institute,Shenzhen 528001,China;Key Laboratory of Ministry of Education for Geomechanics and Embankment Engineering,Hohai University,Nanjing 210098,China)
机构地区:[1]深圳市水务规划设计院股份有限公司水务工程院,广东深圳518001 [2]河海大学岩土力学与堤坝工程教育部重点实验室,江苏南京210024
出 处:《吉林水利》2024年第10期1-6,共6页Jilin Water Resources
基 金:THM耦合过程中深埋岩石裂纹扩展演化规律与裂纹三维重构理论研究(国家自然科学基金面上项目,项目编号:51878249)。
摘 要:为探究不同支护形式对多地层边坡开挖破坏的影响规律,依托贵州某复杂多地层溢洪道边坡工程,基于有限元强度折减理论,开展喷锚+预应力锚索以及锚杆+抗滑桩支护下的多地层边坡开挖模拟,对比模拟与现场监测结果。结果表明:采用锚杆+抗滑桩支护方案优于喷锚+预应力锚索支护方案,稳定安全系数由1.20提升至1.45;锚杆+抗滑桩支护后边坡整体位移从坡顶到坡脚逐渐减小;抗滑桩弯矩值和剪力值的最大值处均位于岩土体结构面或交界面处,锚杆的轴向力从坡顶到坡脚呈现先减小后增大趋势,最大轴向拉力约57.4 kN;采用锚杆+抗滑桩支护后,边坡现场位移监测数据变化速率逐渐减小,现场监测点的最大位移与数值模拟最大位移值基本吻合,证明数值模拟结果的可靠性。In order to explore the influence of different support forms on the excavation-induced failure of multi-layered slopes,basing on the complex multi-layered spillway slope project,finite element strength reduction theory is employed to conduct simulations of excavation under both anchored with prestressed anchor cables and anchored with anti-sliding piles support schemes.The simulation results are then compared with on-site monitoring data.The results indicate that the use of anchored with anti-sliding piles support scheme is better than the anchored with prestressed anchor cables support scheme,with the stability safety factor increasing from 1.20 to 1.45.After employing the anchored with anti-sliding piles support,the overall displacement of the slope gradually decreases from top to toe of the slope.The maximum values of bending moment and shear force of the anti-sliding piles are located at the rock-soil interface or junction,while the axial force of the anchors shows a trend of decreasing from the top to the toe of the slope,with a maximum axial tensile force of approximately 57.4 kN.After using the anchored with anti-sliding piles support,the rate of change of on-site displacement monitoring data gradually decreases,and the maximum displacement of on-site monitoring points is in good agreement with the maximum displacement value from numerical simulations,demonstrating the reliability of the numerical simulation results.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.117.189.143