波形钢腹板节段组合梁接缝焊接残余应力分析  

Analysis of Welding Residual Stress in the Seam of Segmental Composite Beams with Corrugated Steel Webs

在线阅读下载全文

作  者:胡来平 窦金行 HU Lai-ping;DOU Jin-hang(Yuhang District of Hangzhou Transportation Administrative Enforcement Team,Hangzhou 311100,China;CCCC Second Harbor Engineering Company Ltd,Wuhan 430040,China)

机构地区:[1]杭州市余杭区交通运输行政执法队,杭州311100 [2]中交第二航务工程局有限公司,武汉430040

出  处:《建材世界》2024年第5期108-111,120,共5页The World of Building Materials

基  金:交通运输部科技研发项目(201431949A230).

摘  要:为探究焊接残余应力对波形钢腹板节段组合梁的影响及分析混凝土顶底板是否开裂,基于FEA(Finite Element Analysis,有限元分析)软件,建立焊接数值分析模型,探讨焊接高温的影响。结果表明:在焊接高温作用下,波腹板会产生横桥向的变形和顺桥向的压缩,波腹板和顶底板中均会存在残余应力;通过在波腹板与顶底板相交处设置半圆形开口,可以避免应力集中导致的波腹板开裂;同时,混凝土顶底板在预应力的作用下不会开裂。To explore the impact of welding residual stress on the corrugated steel web section composite beam and to analyze whether the concrete top and bottom plates crack,a welding numerical analysis model was established based on FEA software to investigate the influence of high welding temperature.The results show that under the effect of high welding temperature,the corrugated steel web will undergo transverse bridge deformation and longitudinal bridge compression,and residual stress will exist in both the corrugated steel web and the concrete top and bottom plates.By setting a semi-circular opening at the intersection of the corrugated steel web and the concrete top and bottom plates,the cracking of the corrugated steel web caused by stress concentration can be avoided.Meanwhile,the concrete top and bottom plates will not crack under the action of prestress.

关 键 词:波形钢腹板 节段梁 焊接高温 残余应力 焊接模拟 

分 类 号:U441[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象