作 者:贾维君 JIA Weijun(China Railway Major Bridge Group Fourth Engineering Co.Ltd.,Nanjing 210031,China)
机构地区:[1]中铁大桥局集团第四工程有限公司,南京210031
出 处:《铁道建筑》2024年第9期97-100,共4页Railway Engineering
摘 要:沪苏通长江公铁大桥主跨跨度1 092 m,桥区河段航道为Ⅰ-(1)航道。大桥主通航孔按代表船型5万吨级集装箱船和10万吨级散货船、代表船队16×3 000 t级内河船队考虑防撞标准。防船撞设施采用钢-复合材料浮式结构,具有结构复杂、平面尺寸大、质量大等特点。采用如下总体施工方案,即工厂内分段加工制造,整体预拼装后解体,再将各分段通过龙门吊移至港池内,在港池内组装成大节段,通过拖船拖带浮运至桥址,用螺栓连接成整体,实现了安全、优质、快速安装。The main span of the Shanghai-Suzhou-Nantong Yangtze River Rail-cum-Road Bridge is 1092 m,and the waterway in the bridge area isⅠ-(1)waterway.The main navigation holes of the bridge are based on the anti-collision standards for the representative ship types of 50000 t container ships and 100000 t bulk carriers,and the representative fleet of 16×3000 t inland river fleet.The anti-collision facilities are made of steel-composite floating structure,which has the characteristics of complex structure,large plane size and heavy weight.The overall construction plan has been adopted to achieve safe,high-quality,and fast installation,which involves segmented processing and manufacturing in the factory,disassembly after overall pre-assembly,and then moving each segment to the harbor basin through a gantry crane.The segments are assembled into large sections in the harbor basin and towed by a tugboat to the bridge site,where they are bolted together as a whole.
关 键 词:沪苏通长江公铁大桥 防船撞 钢-复合材料 大节段 浮运 制造 安装
分 类 号:U447[建筑科学—桥梁与隧道工程] U445.467[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.191.28.129