检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:鄢发斌 周旭东 YAN Fa-Bin;ZHOU Xu-dong(Regional Geological Survey Team,Sichuan Bureau of Geology and Mineral Exploration and Development,Chengdu 610213)
机构地区:[1]四川省地质矿产勘查开发局区域地质调查队,四川成都610213
出 处:《云南地质》2024年第3期469-472,共4页Yunnan Geology
摘 要:为解决排洪隧道建设过程中地质条件复杂影响稳定性的问题。本文以木里县梭罗沟金矿新建排洪隧洞工程为例,首先对隧洞工程地质条件进行了分析评价,然后将隧洞围岩分级及各级物理力学参数进行了试验分析,以掌握围岩的岩土力学参数,最后根据对新建排洪隧洞洞身进行了设计。该设计可以有效的支撑后续工程施工,保证施工过程的安全。To solve the problem that the complex geological conditions affect the stability during the construction of flood discharge tunnels,The geological conditions of the newly-built flood discharge tunnel project at Suoluogou Gold Deposit in Muli County were analyzed and evaluated.Then,the surrounding rock of the tunnel was classified,and the physical and mechanical parameters of each level were tested and analyzed to grasp the geotechnical parameters of the surrounding rock.Finally,the newly-built flood discharge tunnel was designed,which can effectively support subsequent construction projects and ensure the safety of the construction process.
关 键 词:新建排洪隧洞 围岩 工程地质条件 设计 梭罗沟金矿 四川木里
分 类 号:TV551.12[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7