检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李子邦 张亮[2] 刘豪 龚星 LI Zi-bang;ZHANG Liang;LIU Hao;GONG Xing(School of Civil and Transportation Engineering,Guangdong University of Technology,Guangzhou 510006,China;Yangtze River Survey and Technology Research Institute of the Ministry of Water Resources,Wuhan 430011,China;Guangdong Yue Road Survey and Design Co,Guangzhou 510630,China)
机构地区:[1]广东工业大学土木与交通工程学院,广东广州510006 [2]水利部长江勘测技术研究所,湖北武汉430011 [3]广东粤路勘察设计有限公司,广东广州510630
出 处:《中国环境科学》2024年第10期5607-5619,共13页China Environmental Science
基 金:国家自然科学基金(42002249,52208336)。
摘 要:本文结合物理力学测试、静态批和动态柱试验、微观表征分析、地下水数值模拟等手段分析了竹炭-沸石混合料填充可渗透性反应墙(PRB)对镉的吸附机理和时效性.竹炭(粒径大于0.18mm)和沸石(粒径大于0.5mm)按照质量分数1:10∼3:10混合时,不仅能有效去除地下水中镉,而且具备良好的渗透性和抗剪强度.竹炭-沸石混合料对镉的吸附能力随竹炭配比增加而增大,随粒径减小而增加;PRB柱穿透和耗竭时间随地下水流量和镉浓度增加而缩短.竹炭-沸石混合料去除镉的过程主要是发生络合反应、螯合作用、离子交换反应.地下水镉污染场地的PRB墙体厚度越大,地下水流速越慢,PRB的有效运行时间越长.This paper analyzes the adsorption mechanism of the Permeable Reactive Barrier(PRB)with bamboo charcoal-zeolite mixture to cadmium,as well as its timeliness combining physico-mechanical tests,static batch tests,dynamic column experiments,microscopic characterization analysis,and groundwater flowing numerical simulation.When bamboo charcoals(particle size greater than 0.18mm)and zeolites(particle size greater than 0.5mm)were mixed in a mass fraction of 1:10 to 3:10,the bamboo charcoal-zeolite mixtures could not only remove cadmium from groundwater effectively,but also had good permeability and shear strength.The adsorption capacity of the bamboo charcoal-zeolite mixtures for cadmium increased with the growing bamboo charcoal ratio and decreasing particle size.The penetration and depletion time of the PRB column decreased with increasing groundwater flowing rate and column concentration.The removal reactions of cadmium by bamboo charcoal-zeolite mixtures mainly included complexation,chelation,and ion-exchange.At a groundwater cadmium contaminated site with a thicker PRB and slower groundwater flowing rate,the effective operation time of the PRB was longer.
分 类 号:X523[环境科学与工程—环境工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.221.227.158