110 kV电力输电线路施工方法及技术分析  被引量:1

Analysis of Construction Method and Technology of 110 kV Power Transmission Lines

在线阅读下载全文

作  者:童有超 TONG Youchao(Jinan Changqing District Power Supply Company of State Grid Shandong Electric Power Company,Jinan,Shandong Province,250300 China)

机构地区:[1]国网山东省电力公司济南市长清区供电公司,山东济南250300

出  处:《科技资讯》2024年第18期75-77,共3页Science & Technology Information

摘  要:110 kV既是变电站的入电电压,也是高压侧电压,因此,保障110 kV线路的运行安全是确保变电站正常运行的关键。为了实现这一目标,需要采取一系列措施来提高110 kV线路的可靠性与安全性。结合当前我国110 kV电力输电线路施工的实际情况,以110 kV电力输电线路为主要研究对象,着重从输电线路施工的角度明确110 kV电力输电线路中应用的施工方法,进而探讨110 kV电力输电线路应用的施工技术,希望能够为保障和提升110 kV输电线路的运行安全提供借鉴思路和经验。110 kV is the incoming voltage of the substation and also the high-voltage measurement voltage,so en⁃suring the safe operation of the 110 kV line is the key to ensuring the normal operation of the substation.To achieve this goal,a series of measures need to be taken to improve the reliability and safety of the 110 kV line.Based on the actual situation of 110 kV power transmission line construction in China,this study takes 110 kV power transmission lines as the main research object,clarifies the construction methods applied in 110 kV power transmission lines from the perspective of transmission line construction,and further explores the construction tech⁃nologies applied in 110 kV power transmission lines,hoping to provide reference ideas and experience for ensuring and improving the operation safety of 110 kV transmission lines.

关 键 词:110 kV电力输电线路 施工方法 施工技术 电压 

分 类 号:TM75[电气工程—电力系统及自动化]

 