检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨金顺 林晓喻 于冉冉 孙成玲 陈秀锋 贾晓旭 YANG Jin-shun;LIN Xiao-yu;YU Ran-ran;SUN Cheng-ling;CHEN Xiu-feng;JIA Xiao-xu(School of Civil Engineering,Qingdao University of Technology,Qingdao 266520,China;Qingdao Municipal Engineering Design and Research Institute Limited Liability Company,Qingdao 266100,China)
机构地区:[1]青岛理工大学土木工程学院,青岛266520 [2]青岛市市政工程设计研究院有限责任公司,青岛266100
出 处:《科学技术与工程》2024年第27期11851-11860,共10页Science Technology and Engineering
基 金:青岛市哲学社会科学规划项目(QDSKL2101168)。
摘 要:针对公交车进出港湾车站停靠不顺畅,车站几何尺寸设置与公交车运行轨迹不完全相符等问题,通过研究青岛市主干路滨海大道相同规格港湾车站公交车停靠过程,分析港湾车站车辆进出站速度、加速度、轨迹等交通要素变化特性及其相互关系,基于公交车实际进出站轨迹数据构建Gauss轨迹模型,并对港湾车站的几何设计参数进行优化。结果表明:公交车速度在车站的减速段呈现两阶段变化趋势,在加速段呈现单阶段变化;公交车进出站期间的综合加速度平稳变化,纵向加速度由负值变正值,横向加速度基本不变;轨迹模型与实际拟合轨迹相似度达到0.9913;港湾车站进出站过程中的转弯曲线半径大于现行规范中的曲线半径,在准备进出停靠段时的转弯曲线半径小于现行规范中曲线半径,加减速段长度相等。相比于传统车站设计,优化后的车站设计使公交车进站过程更加流畅,可提高公交车进站过程运行效率并节约用地面积。In view of the problems that buses do not stop smoothly in and out of the harbor station,and the geometric size of the station is not fully compatible with the trajectory of buses,the bus stopping process of the same specification of the harbor station on Binhai Avenue,a main road in Qingdao,was analyzed,and the characteristics of the change of the traffic elements such as speed,acceleration,trajectory and other traffic elements and their interrelationships were analyzed,and the Gauss trajectory model of the bus geometric design parameters were established based on the trajectory data of the buses entering and exiting the station.The Gauss trajectory model was constructed based on the actual trajectory data of buses,and the geometric design parameters of the harbor station were optimized.The results show these as follows.The speed of buses in the deceleration section of the station shows a two-stage change trend,and in the acceleration section shows a single-stage change.The comprehensive acceleration of buses during the period of entering and exiting the station changes steadily,the longitudinal acceleration is changed from negative to positive,and the transversal acceleration is basically unchanged.The trajectory model is similar to the actual fitting trajectory with the similarity degree of 0.9913;the radius of the turning curve during the process of entering and exiting the station of the harbor station is larger than that of the curve in the current specification.The radius of the turning curve in the process of entering and exiting the harbor station is larger than the radius of the curve in the current specification,the radius of the turning curve in the preparation for entering and exiting the stopping section is smaller than the radius of the curve in the current specification,and the length of the acceleration and deceleration sections is equal.Compared with the traditional station design,the optimized station design makes buses entry process smoother,improves the efficiency of the bus entry process and
分 类 号:U491.7[交通运输工程—交通运输规划与管理]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.141.199.214