检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李庆荣 Li Qingrong(Shenzhen Huayang International Engineering Design Co.,Ltd.,Shenzhen,Guangdong 518000)
机构地区:[1]深圳市华阳国际工程设计股份有限公司,广东深圳518000
出 处:《现代工程科技》2024年第18期25-28,共4页Modern Engineering Technology
摘 要:旨在详细研究动物楼配电要求、动物楼安装功率及变压器负荷面积指标容量。动物楼配电需要保证动物楼饲殖动物生活环境和通风换气。动物楼负荷指标现有手册无对应经验数据,需要根据现有项目统计。研究表明动物楼配电需要更高可靠性,需要至少两路市政高压双重电源;安装功率指标考虑400W/m^(2)(不含电锅炉)左右,变压器安装指标考虑250~2300VA/m^(2)区间。To conduct a detailed study on the power distribution requirements of the animal building,as well as the installation power and transformer load area index capacity of the animal building.The power distribution in the animal building needs to ensure the living environment and ventilation of the breeding animals in the animal building.The existing manual for animal building load indicators does not have corresponding empirical data,and it needs to be calculated based on existing projects.Research has shown that animal building power distribution requires higher reliability and requires at least two municipal high-voltage dual 2 power sources;The installation power index is considered to be around 400 W/m^(2)(excluding electric boilers),and the transformer installation index is considered to be in the range of 250-300 VA/m^(2).
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.224.2.133