检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王强 WANG Qiang(Dongying District Transportation Bureau of Dongying City,Dongying 257000,China)
机构地区:[1]东营市东营区交通运输局,山东东营257000
出 处:《工程建设与设计》2024年第19期96-98,共3页Construction & Design for Engineering
摘 要:为了有效预防和处理影响市政道路桥梁工程的质量通病,研究过程着重分析了桥梁大体积混凝土结构温度裂缝的成因和桩基础常见的质量缺陷,进而提出有效的预防措施和处理方法。针对温度裂缝,设置内外部温度监测传感器,通过使用低热水泥、预埋冷却降温水管等措施控制内外部温差。对于桩基偏斜、桩体夹泥和桩体不完整等问题,提出综合运用钢护筒导向、泥浆护壁、钻孔过程测量与调控、成桩质量检测、桩体顶推法纠偏进行预防或处理。In order to effectively prevent and deal with the common quality problems affecting municipal road and bridge engineering,the research process focuses on analyzing the causes of temperature cracks of bridge mass concrete structure and the common quality defects of pile foundation,and then puts forward effective preventive measures and treatment methods.For temperature cracks,internal and external temperature monitoring sensors should be set up to control the internal and external temperature differences by using low-heat cement,embedded cooling water pipes and other measures.For pile foundation deflection,pile body mud,pile body incomplete and other problems can be prevented or dealt with by comprehensive use of steel drum guidance,mud wall protection,drilling process measurement and control,pile quality detection,pile body pushing correction.
分 类 号:U445.71[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.139.83.202