检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:冯伟 FENG Wei(Sichuan Dujin Mountain Rail Transit Co.Ltd.,Chengdu 611830,China)
机构地区:[1]四川都金山地轨道交通有限责任公司,成都611830
出 处:《工程建设与设计》2024年第19期133-136,共4页Construction & Design for Engineering
摘 要:依托观音坪隧道辅助坑道施工实际,探究隧道结构在穿越软弱围岩时的稳定性问题,并探索最优支护参数。通过采用MIDAS GTS NX数值模拟软件,针对不同围岩等级、不同钢架间距以及不同初期支护材料建立模型,研究不同的围岩等级与支护组合,对初期支护变形及应力、锚杆轴向变形以及钢拱架最大变形等支护结构的稳定性影响。Based on the actual construction of auxiliary adit of Guanyinping Tunnel,this paper explores the stability of the tunnel structure when it passes through the weak surrounding rock,and explores the optimal supporting parameters.MIDAS GTS NX numerical simulation software was used to establish models for different surrounding rock grades,different steel frame spacing and different initial support materials,and to study the influence of different combination of surrounding rock grades and support on the stability of initial support deformation and stress,axial deformation of anchor bolt and maximum deformation of steel arch structure.
分 类 号:U455.7[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.113