检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘生辉 杜心愿 宋欣 LIU Sheng-hui;DU Xin-yuan;SONG Xin(The Third Construction Engineering Co.Ltd.of China Construction Second Engineering Bureau,Beijing 100070,China)
机构地区:[1]中建二局第三建筑工程有限公司,北京100070
出 处:《工程建设与设计》2024年第19期184-186,共3页Construction & Design for Engineering
摘 要:针对市政工程中钢混叠合梁斜拉桥施工过程中的稳定性不足的问题,提出了一种临时对拉索与塔梁同步施工的综合优化方案。通过精确计算临时对拉索的力学性能及预应力水平,并实施塔梁同步控制,解决了施工阶段应力不均匀和位移过大的问题。仿真结果表明,优化后斜拉索成桥索力误差降至0%~3%,主梁竖向位移显著降低。Aiming at the problems of low stability during the construction of cable-stayed bridges with composite steel beams in municipal engineering,a comprehensive optimization scheme of simultaneous construction of cable and tower beams is proposed.The problems of uneven stress and excessive displacement are solved by calculating the mechanical properties and prestress level of the cable and implementing synchronous control of the tower beam.The simulation results show that the error of cable force is reduced to 0%~3%and the vertical displacement of main beam is significantly reduced.
关 键 词:市政工程 钢混叠合梁斜拉桥 临时对拉索 塔梁同步控制
分 类 号:U445.57[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15